Electrifying an icon in the Caribbean!
We are proud to contribute to a truly iconic project: the renovation and electrification of the Queen Emma Bridge in Willemstad, Curaçao.
The dredger is built at St Johns Shipbuilding in Palatka, Florida and will be operating in Wilmington, North Carolina.
The vessel will perform maintenance in the main seaports of Wilmington and Morehead City for maintaining the depths at all berths, wharves and turning basins year- round, which will maximize the vessel tonnage capabilities at these ports.
The WID is designed to be low in maintenance and ease of operation per NCSPA requirements.
Van der Leun supplied the following features:
• System integration
• Main Switchboard
• Distribution board
• Variable frequency convertor
• Engineering and project management
• Shore supply
• Wheelhouse desk / ECR console
• Emergency Stop system
• Fire detection system
• Battery chargers incl. batteries and battery boxes
• Commissioning
• Installation
We are proud to contribute to a truly iconic project: the renovation and electrification of the Queen Emma Bridge in Willemstad, Curaçao.
Royal Van der Leun has been awarded the contract for the complete electrical installation package of a Beagle® 10.2 trailing suction hopper dredger, developed by Royal IHC for The Dutra Group.
Once again, we celebrated our annual Christmas get-together last week, this time not with a traditional dinner, but with a festive late lunch. Somewhere between lunch and dinner, a “linner” (or “dunch”), if you will.