New Energy Storage Installation by Royal Van der Leun x Alfen

We’re happy to share our latest collaboration with Alfen! Together, we built this cutting-edge energy storage system from beginning to end.

14a79f26-e8d2-4204-b208-5d63a9ac7973
20240918-182316-resized
royal-van-der-leun-metaalbewerking-skids-van-alfen-augustus-2024-2-
royal-van-der-leun-metaalbewerking-skids-van-alfen-augustus-2024-3-
royal-van-der-leun-metaalbewerking-skids-van-alfen-resized

Solid Start

During the planning phase, we tackled challenges around lead time, labor, durability, and quality, creating an efficient solution.

Our Metal Works division:

  • Engineered and calculated the structural strength of the skids.
  • Welded and assembled them at our Sliedrecht workshop.

After, the skids are galvanized to enhance their durability and prevent rust, ensuring they can support 56 tons.

Our EMS installation team:

  • Installed cables, cabinets, and DC-bus cabinets on the skids
  • Connects the installation to the HV grid

Sustainable Solution

Each skid will house Alfen batteries with a total capacity of 40 MWh—enough to power your home and those of 12 neighbors for a year, using renewable wind energy! This system balances the high-voltage grid by storing surplus energy and providing backup when needed.

Collaboration for a Greener Future

With durable skids, expert installation, and Alfen’s top-tier batteries, we’re proud to contribute to a more sustainable future. Thanks to Alfen for their trust—here’s to many more innovative projects together!

More news

Meer berichten
IMG_7921

Alvaret at Work for Trafikverket

After months of intensive work, it is always a special moment to see a project at its final destination.

Read more
Alvaret at Work for Trafikverket
europort-visual-e-1

Ready for the maritime event of the year?

From 4 to 7 November, the maritime world will dock at Rotterdam Ahoy for Europort 2025, and we’d love to see you there at stand 1322.

Read more
Ready for the maritime event of the year?