New order for the Beagle® 10.2 dredger!
Royal Van der Leun has been awarded the contract for the complete electrical installation package of a Beagle® 10.2 trailing suction hopper dredger, developed by Royal IHC for The Dutra Group.
The first combined battery pack is now with a satisfied customer. More than 40 kWh can be stored, so the green energy cannot be lost. In this way, we not only help companies, but also individuals with a successful energy transition!
After installing 70 solar panels, the desire arose to store the energy gained. Logical, because the sun does not always shine in our beautiful little country. In addition, it is also sustainable and saves our customer a nice amount of money in the long run.
By means of a mobile app, our customer can see, monitor and manage the exact behavior of his energy generation installation. Handy, right?! The installation was installed and handed over to the customer in no time. On to the next one!
The advantages of this solution:
After the first success, we got the hang of it. Are you also interested in a home battery? Contact us or drop by. We are happy to help you find the best solution!
Royal Van der Leun has been awarded the contract for the complete electrical installation package of a Beagle® 10.2 trailing suction hopper dredger, developed by Royal IHC for The Dutra Group.
Once again, we celebrated our annual Christmas get-together last week, this time not with a traditional dinner, but with a festive late lunch. Somewhere between lunch and dinner, a “linner” (or “dunch”), if you will.
From 2 to 5 December 2025, the global maritime industry will gather in Shanghai for Marintec China 2025