Electrifying an icon in the Caribbean!
We are proud to contribute to a truly iconic project: the renovation and electrification of the Queen Emma Bridge in Willemstad, Curaçao.
Royal Van der Leun is taking part in Europort 2025, where maritime innovation and collaboration come together in Rotterdam.
Together with Roboat's automation solutions, our team is showcasing advanced electrical systems, precision metalwork, and integrated solutions that keep vessels reliable. From dredging and offshore operations to workboats and inland shipping.
Europort is always a highlight for us: a chance to meet professionals from across the maritime world, share ideas, and explore how smart engineering drives the future of shipbuilding and marine technology.
Whether you visit us at the exhibition or connect with us afterwards, our team is always ready to power reliability, wherever the water takes you.
We are proud to contribute to a truly iconic project: the renovation and electrification of the Queen Emma Bridge in Willemstad, Curaçao.
Royal Van der Leun has been awarded the contract for the complete electrical installation package of a Beagle® 10.2 trailing suction hopper dredger, developed by Royal IHC for The Dutra Group.
Once again, we celebrated our annual Christmas get-together last week, this time not with a traditional dinner, but with a festive late lunch. Somewhere between lunch and dinner, a “linner” (or “dunch”), if you will.