Electrifying an icon in the Caribbean!
We are proud to contribute to a truly iconic project: the renovation and electrification of the Queen Emma Bridge in Willemstad, Curaçao.
TIP: Optimize energy on board with subsidy options?
We are pleased to tell you more about it!
Our own developed and proven Energy Management System, can be applied to any ship and is suitable for both new as well as existing installations.
By installing EMS you get an optimal efficiency from the drive system which makes an important contribution to a cleaner environment and a better living environment in the future.
Would you like to know what options there are for subsidy when purchasing our EMS system?
If so, the webinar Sustainable Shipbuilding Subsidy Scheme (SDS) might be something for you. This is provided by Rijkswaterstaat, is free of charge and will take place on the 11th of February!
Link to the innovation page:
https://lnkd.in/d9e3dks
Link to the free webinar:
https://lnkd.in/d588d-u
We are proud to contribute to a truly iconic project: the renovation and electrification of the Queen Emma Bridge in Willemstad, Curaçao.
Royal Van der Leun has been awarded the contract for the complete electrical installation package of a Beagle® 10.2 trailing suction hopper dredger, developed by Royal IHC for The Dutra Group.
Once again, we celebrated our annual Christmas get-together last week, this time not with a traditional dinner, but with a festive late lunch. Somewhere between lunch and dinner, a “linner” (or “dunch”), if you will.