A futuristic addition to our metalworking workshop!
We are proud to introduce our brand-new Bodor Laser P3 20 kW.
Read more
Van der Leun Electrical marine systems completed a job for DCN Diving at the Enguri Dam.
The Enguri Dam is a hydroelectric dam on the Enguri river in Georgië and is the largest in Europe.
DCN diving will dredge a 300K m3 of sediment at 200+ meters of water-depth.
For the dredging installation Van der Leun installed, designed and integrated the HV and LV installation on site and provided assistance with commissioning.
We are proud to introduce our brand-new Bodor Laser P3 20 kW.
We are proud to share that Van der Leun Electrobouw has been certified as a Premier Partner of Motorola Solutions.
We’re excited to share an important step forward in our yachting journey at Royal Van der Leun.