Hybrid Combi Freighter 3850
| Shipyard | Damen Shipyards |
| Customer | Reederei Bernd Sibum |
The renovation of the municipal office on Industrieweg in Sliedrecht has been successfully completed
| Customer | Gemeente Sliedrecht |
The renovated municipal office and public service centre have been given a fresh, contemporary appearance and equipped with technical installations that meet today's requirements while being prepared for future developments.
Royal Van der Leun Electrobouw was responsible for the complete electrical renovation of the municipal office. Our team delivered a wide range of electrical and security installations that contribute to a safe, reliable and efficient working environment.
Royal Van der Leun carried out, among others:
A large part of the work carried out is not immediately visible after completion. That is exactly what defines a well-designed installation. Behind the scenes, the electrical and security systems ensure that the building can be used safely, efficiently and reliably every day.
The renovation was also designed with flexibility in mind. Additional connection points and technical provisions have been incorporated throughout the building, allowing future expansions or modifications to be implemented quickly and efficiently.
Delivering this project in Sliedrecht makes it especially meaningful for Royal Van der Leun. This is where our story began. For more than a century, our local craftsmanship has formed the foundation for the electrical solutions we deliver to customers across the Netherlands and around the world.
With the complete electrical renovation of the municipal office, Royal Van der Leun Electrobouw has once again contributed to a future-proof, safe and reliable public building in our own community.
| Shipyard | Damen Shipyards |
| Customer | Reederei Bernd Sibum |