Hybrid Combi Freighter 3850
| Shipyard | Damen Shipyards |
| Customer | Reederei Bernd Sibum |
Read more
After the success of the first 6000 m3 TSHD Arzana, NMDC decided to have a second, slightly bigger hopper dredger built—a 8000 m3 hopper dredger, to be exact. The installation remained virtually the same, which was a great advantage for IHC and for us.
| Shipyard | Royal IHC Kinderdijk |
| Customer | NMDC |
All equipment was produced in accordance with the rules and regulations of Bureau Veritas.
| Shipyard | Damen Shipyards |
| Customer | Reederei Bernd Sibum |